Progress over at XMF today. Hopefully this is the last time we see it upsidedown!
Some gauges wired up. Keeping it simple this time, two gauges one switch.
The main electrical panel and harness all wired up. The ecu Muzzy used is nice and compact.
Back side of the panel. Still some wire hold downs and edging to do, but thats enough for this weekend.
One closer of the font. again, a couple wire hold downs to install yet.
Stripped and almost ready for powder.
The next project to wire at XMF. Dezert race RZR!! All this race car stuff really makes me want to have XMF build me a new one
.