Loaded and Heading to Cedar City, UT to Assemble..
Thad has finished the Build.. Now taking home to Cedar City, Utah to assemble.
Thank You Thad for your design and vision for this Build. It turned out better than imagined but just like the concept drawing.
Finish Date will be prior to Sept 27 for the HDRA Moapa Big Horn 300
Should arrive in Cedar City this Monday the 22nd. Ready to install all parts starting with..
Damone and Tyson from HCR Racing will install HCR Racing Suspension with King 2.5 Shocks also installing Limit Straps from KarTek and Front and Rear Gusset kit.
Gear One Rack and Pinion and Polaris Power Steering.
Rusty from Triple S Polaris of Cedar City waiting to install Engine with Muzzys Big Bore kit, Muzzys Dual Exhaust and Triple S Head Work.
Method Wheels 15x7 Matte Black with Machined Bead Locks will arrive mid August.
WHAT TIRES SHOULD WE RUN? THE GBC MONGRAL OR THE BFGS OR?
Twisted Stitch seats for both Driver and CoDriver.
Twisted Stitch Nets - Cardboard forms are sent out to be made.
Just received new screen printed switches from UTVINC to identify each component.
Also received new PCI radio and intercom. Looking forward to new design of the Noise canceling Intercom from PCI.
Rigid Lights front and rear. 30 inch rear Rigid light will have Rear Taillights and Brake Lights,Amber strobe, Solid Amber and Soild Blue integrated in rear light bar.